Project Years
2023
Project Location
Lebda
Project Description
PARTNER TEKNIK has undertaken the new project from Libya. This project contains the electrical and mechanical works.
To sum up the project;
This project will be implemented at bulk berth area. There is an existing cathodic protection at site. However, it needs upgrade. It means, some part of equipment will be maintain and some part of equipment will be change with new ones.
The scope of work is given below;
•The transformer type 24V DC, 200A DC rectifier will be maintained. This maintenance will include the control system, painting of the cabinet, terminals, connections of cable, the handle of the cabinet of rectifier unit.
•The electrical and control cables will be checked of their connection terminal and if required, it will be repaired and changed.
•The MMO coated titanium anodes will be inspected and after inspection if required, it will be replaced with new anodes and reinstalled properly.
•Reinstallation of Ag/AgCl reference electrodes.
•Repair of reference cells.(The connection terminals will be maintained and if required, it will be changed).
|